The Spread Maps Request an invite

Was the forecast right for San Diego on Mon Sep 28?

San Diego, California · daily high temperature in °F · forecasts from each model's archived runs, verified against the Lindbergh Field (SAN) observations

14 days out, 4 models put San Diego's Mon Sep 28 high anywhere from 71° to 91°; by the final call, the day before, the field had settled to a median of 79°. The day verified at 78° against the Lindbergh Field (SAN) observations.

ICON landed closest, off by 0.6°. UKMO ran 5° warm.

14 days out the models said 71–91; it hit 78. ICON led (off 0.6°F); UKMO ran 5°F warm.
The shareable card for this day: what this page looks like pasted into a thread.

What every model said, at every lead

Forecast highs for Mon Sep 28 as each model's run approached it, recorded from the last archived model run per day. NBM and The Spread's own blend are omitted because they average the other models.

Lead AIFSAIGFSECMWFGEMGFSICONUKMO Range
15d · Sep 13 — 89° — — 72° — — 72–89°
14d · Sep 14 91° 73° 86° — 71° — — 71–91°
13d · Sep 15 82° 86° 84° — 84° — — 82–86°
12d · Sep 16 76° 79° 84° — 77° — — 76–84°
11d · Sep 17 79° 81° 82° — 85° — — 79–85°
10d · Sep 18 78° 88° 95° — 88° — — 78–95°
9d · Sep 19 82° 80° 92° 77° 77° — — 77–92°
8d · Sep 20 80° 84° 85° 78° 82° — — 78–85°
7d · Sep 21 84° 77° 84° 81° 79° — — 77–84°
6d · Sep 22 82° 78° 82° 79° 76° 82° — 76–82°
5d · Sep 23 73° 78° 83° 80° 80° 76° 83° 73–83°
4d · Sep 24 76° 78° 82° 78° 74° 83° 80° 74–83°
3d · Sep 25 78° 79° 83° 77° 75° 76° 83° 75–83°
2d · Sep 26 77° 80° 83° 79° 76° 78° 84° 76–84°
1d · Sep 27 77° 79° 82° 79° 76° 79° 83° 76–83°
actual 78°

What one day can show

A score for one day isn't very meaningful; a useful ranking needs many days of data. See which model has been most accurate in San Diego, or in every city The Spread scores.

Forecasts are what each model's archived runs said at the time they were recorded by The Spread; nothing is reconstructed after the fact. Truth is the Lindbergh Field (SAN) observations. The actual values are the ones in hand when this day was verified, usually 2 days after the date; a correction published after that is not carried into it. Archive depth varies by city; verified days exist only for dates the archive watched arrive.