The Spread Maps Request an invite

Was the forecast right for San Diego on Mon Sep 21?

San Diego, California · daily high temperature in °F · forecasts from each model's archived runs, verified against the Lindbergh Field (SAN) observations

14 days out, 4 models put San Diego's Mon Sep 21 high anywhere from 78° to 87°; by the final call, the day before, the field had settled to a median of 75°. The day verified at 77° against the Lindbergh Field (SAN) observations.

ICON landed closest, off by 0.3°. GFS ran 3° cool.

14 days out the models said 78–87; it hit 77. ICON led (off 0.3°F); GFS ran 3°F cool.
The shareable card for this day: what this page looks like pasted into a thread.

What every model said, at every lead

Forecast highs for Mon Sep 21 as each model's run approached it, recorded from the last archived model run per day. NBM and The Spread's own blend are omitted because they average the other models.

Lead AIFSAIGFSECMWFGEMGFSICONUKMO Range
15d · Sep 6 — 82° — — 75° — — 75–82°
14d · Sep 7 81° 87° 78° — 78° — — 78–87°
13d · Sep 8 81° 80° 88° — 75° — — 75–88°
12d · Sep 9 82° 87° 82° — 77° — — 77–87°
11d · Sep 10 77° 79° 82° — 74° — — 74–82°
10d · Sep 11 78° 76° 81° — 79° — — 76–81°
9d · Sep 12 76° 77° 85° 80° 76° — — 76–85°
8d · Sep 13 76° 77° 79° 75° 74° — — 74–79°
7d · Sep 14 76° 76° 77° 75° 73° — — 73–77°
6d · Sep 15 76° 75° 77° 77° 73° 78° 78° 73–78°
5d · Sep 16 76° 74° 79° 77° 73° 77° 76° 73–79°
4d · Sep 17 74° 74° 80° 76° 73° 77° 75° 73–80°
3d · Sep 18 75° 74° 80° 75° 73° 77° 76° 73–80°
2d · Sep 19 75° 74° 80° 76° 72° 77° 77° 72–80°
1d · Sep 20 75° 74° 80° 75° 74° 77° 76° 74–80°
actual 77°

What one day can show

A score for one day isn't very meaningful; a useful ranking needs many days of data. See which model has been most accurate in San Diego, or in every city The Spread scores.

Forecasts are what each model's archived runs said at the time they were recorded by The Spread; nothing is reconstructed after the fact. Truth is the Lindbergh Field (SAN) observations. The actual values are the ones in hand when this day was verified, usually 2 days after the date; a correction published after that is not carried into it. Archive depth varies by city; verified days exist only for dates the archive watched arrive.