Was the forecast right for Milan on Fri Nov 13?
Milan, Italy · daily high temperature in °F · forecasts from each model's archived runs, verified against the Linate (LIML) observations
14 days out, 4 models put Milan's Fri Nov 13 high anywhere from 52° to 56°; by the final call, the day before, the field had settled to a median of 60°. The day verified at 61° against the Linate (LIML) observations, with 0.02 in of precipitation.
ICON landed closest, off by 0.0°. GEM ran 3° cool.
What every model said, at every lead
Forecast highs for Fri Nov 13 as each model's run approached it, recorded from the last archived model run per day. NBM and The Spread's own blend are omitted because they average the other models.
| Lead | AIFS | AIGFS | ECMWF | GEM | GFS | ICON | UKMO | Range |
|---|---|---|---|---|---|---|---|---|
| 15d · Oct 29 | — | 52° | — | — | 51° | — | — | 51–52° |
| 14d · Oct 30 | 56° | 54° | 54° | — | 52° | — | — | 52–56° |
| 13d · Oct 31 | 52° | 60° | 56° | — | 50° | — | — | 50–60° |
| 12d · Nov 1 | 56° | 53° | 56° | — | 54° | — | — | 53–56° |
| 11d · Nov 2 | 58° | 60° | 52° | — | 56° | — | — | 52–60° |
| 10d · Nov 3 | 54° | 64° | 59° | — | 53° | — | — | 53–64° |
| 9d · Nov 4 | 54° | 56° | 56° | 50° | 56° | — | — | 50–56° |
| 8d · Nov 5 | 56° | 60° | 62° | 55° | 51° | — | — | 51–62° |
| 7d · Nov 6 | 61° | 58° | 55° | 55° | 55° | — | — | 55–61° |
| 6d · Nov 7 | 59° | 60° | 60° | 56° | 58° | 58° | 60° | 56–60° |
| 5d · Nov 8 | 61° | 60° | 59° | 56° | 55° | 59° | 57° | 55–61° |
| 4d · Nov 9 | 59° | 58° | 55° | 55° | 57° | 58° | 59° | 55–59° |
| 3d · Nov 10 | 63° | 61° | 58° | 58° | 60° | 59° | 59° | 58–63° |
| 2d · Nov 11 | 63° | 62° | 58° | 58° | 59° | 61° | 56° | 56–63° |
| 1d · Nov 12 | 61° | 62° | 60° | 58° | 60° | 61° | 58° | 58–62° |
| actual | 61° |
What one day can show
A score for one day isn't very meaningful; a useful ranking needs many days of data. See which model has been most accurate in Milan, or in every city The Spread scores.
Forecasts are what each model's archived runs said at the time they were recorded by The Spread; nothing is reconstructed after the fact. Truth is the Linate (LIML) observations. The actual values are the ones in hand when this day was verified, usually 2 days after the date; a correction published after that is not carried into it. Archive depth varies by city; verified days exist only for dates the archive watched arrive.