Was the forecast right for Milan on Mon Sep 7?
Milan, Italy · daily high temperature in °F · forecasts from each model's archived runs, verified against the Linate (LIML) observations
14 days out, 4 models put Milan's Mon Sep 7 high anywhere from 81° to 83°; by the final call, the day before, the field had settled to a median of 92°. The day verified at 91° against the Linate (LIML) observations.
GEM landed closest, off by 0.1°. AIFS ran 2° cool.
What every model said, at every lead
Forecast highs for Mon Sep 7 as each model's run approached it, recorded from the last archived model run per day. NBM and The Spread's own blend are omitted because they average the other models.
| Lead | AIFS | AIGFS | ECMWF | GEM | GFS | ICON | UKMO | Range |
|---|---|---|---|---|---|---|---|---|
| 15d · Aug 23 | — | 79° | — | — | 95° | — | — | 79–95° |
| 14d · Aug 24 | 83° | 83° | 83° | — | 81° | — | — | 81–83° |
| 13d · Aug 25 | 81° | 90° | 90° | — | 71° | — | — | 71–90° |
| 12d · Aug 26 | 84° | 76° | 89° | — | 95° | — | — | 76–95° |
| 11d · Aug 27 | 87° | 97° | 87° | — | 93° | — | — | 87–97° |
| 10d · Aug 28 | 88° | 90° | 85° | — | 90° | — | — | 85–90° |
| 9d · Aug 29 | 88° | 86° | 93° | 92° | 95° | — | — | 86–95° |
| 8d · Aug 30 | 89° | 88° | 93° | 92° | 89° | — | — | 88–93° |
| 7d · Aug 31 | 90° | 93° | 94° | 96° | 90° | — | — | 90–96° |
| 6d · Sep 1 | 89° | 93° | 96° | 96° | 92° | 90° | 93° | 89–96° |
| 5d · Sep 2 | 83° | 91° | 93° | 92° | 90° | 92° | 94° | 83–94° |
| 4d · Sep 3 | 86° | 90° | 92° | 92° | 89° | 91° | 92° | 86–92° |
| 3d · Sep 4 | 88° | 90° | 93° | 91° | 92° | 92° | 85° | 85–93° |
| 2d · Sep 5 | 89° | 91° | 92° | 92° | 93° | 91° | 89° | 89–93° |
| 1d · Sep 6 | 89° | 92° | 92° | 91° | 93° | 92° | 92° | 89–93° |
| actual | 91° |
What one day can show
A score for one day isn't very meaningful; a useful ranking needs many days of data. See which model has been most accurate in Milan, or in every city The Spread scores.
Forecasts are what each model's archived runs said at the time they were recorded by The Spread; nothing is reconstructed after the fact. Truth is the Linate (LIML) observations. The actual values are the ones in hand when this day was verified, usually 2 days after the date; a correction published after that is not carried into it. Archive depth varies by city; verified days exist only for dates the archive watched arrive.