The Spread Maps Request an invite

Was the forecast right for Tampa on Mon Sep 28?

Tampa, Florida · daily high temperature in °C · forecasts from each model's archived runs, verified against the Tampa International (TPA) observations

14 days out, 4 models put Tampa's Mon Sep 28 high anywhere from 27° to 32°; by the final call, the day before, the field had settled to a median of 31°. The day verified at 29° against the Tampa International (TPA) observations.

ICON landed closest, off by 0.1°. ECMWF ran 3° warm.

14 days out the models said 27–32; it hit 29. ICON led (off 0.1°C); ECMWF ran 3°C warm.
The shareable card for this day: what this page looks like pasted into a thread.

What every model said, at every lead

Forecast highs for Mon Sep 28 as each model's run approached it, recorded from the last archived model run per day. NBM and The Spread's own blend are omitted because they average the other models.

Lead AIFSAIGFSECMWFGEMGFSICONUKMO Range
15d · Sep 13 — 27° — — 30° — — 27–30°
14d · Sep 14 32° 32° 27° — 31° — — 27–32°
13d · Sep 15 30° 32° 27° — 34° — — 27–34°
12d · Sep 16 30° 31° 30° — 26° — — 26–31°
11d · Sep 17 29° 33° 31° — 30° — — 29–33°
10d · Sep 18 29° 28° 30° — 33° — — 28–33°
9d · Sep 19 30° 30° 30° 31° 32° — — 30–32°
8d · Sep 20 30° 30° 31° 29° 31° — — 29–31°
7d · Sep 21 29° 31° 30° 31° 30° — — 29–31°
6d · Sep 22 30° 31° 31° 28° 30° 30° — 28–31°
5d · Sep 23 30° 30° 32° 31° 31° 31° 31° 30–32°
4d · Sep 24 29° 30° 32° 31° 31° 29° 30° 29–32°
3d · Sep 25 30° 30° 32° 31° 31° 30° 31° 30–32°
2d · Sep 26 30° 29° 32° 32° 31° 30° 31° 29–32°
1d · Sep 27 31° 30° 33° 31° 30° 30° 31° 30–33°
actual 29°

What one day can show

A score for one day isn't very meaningful; a useful ranking needs many days of data. See which model has been most accurate in Tampa, or in every city The Spread scores.

Forecasts are what each model's archived runs said at the time they were recorded by The Spread; nothing is reconstructed after the fact. Truth is the Tampa International (TPA) observations. The actual values are the ones in hand when this day was verified, usually 2 days after the date; a correction published after that is not carried into it. Archive depth varies by city; verified days exist only for dates the archive watched arrive.